THE Light Rail Transit Line 1 (LRT-1) Cavite Extension is set to start its operation with five new stations on Saturday, November 16, 2024.
President Ferdinand “Bongbong” Marcos Jr. made the announcement on Friday during the inauguration of the LRT-1 Cavite Extension Project (L1CE) Phase 1, marking a significant milestone in modernizing the transport system in the Philippines.
Phase 1 of the L1CE covers the five new stations: Redemptorist-ASEANA, Manila International Airport Road, Parañaque Integrated Terminal Exchange (PITX), Ninoy Aquino Avenue, and Dr. Santos (formerly Sucat).

The project is expected to serve an additional 80,000 passengers daily. It is projected to reduce the travel time between Baclaran, Pasay City and Bacoor, Cavite, from one hour and 10 minutes to just 25 minutes.
President Marcos acknowledged his father, former President Ferdinand E. Marcos Sr., for initiating the construction of Metro Manila’s first urban rail transit system.

The initial endeavor ultimately grew into the larger rail transit system that serves the National Capital Region, including the L1CE.
“On this day, no one is happier than his son in seeing that his father’s foresight is being validated by another work that expands mass transit that he had built for the people that he loved,” the President said during the inauguration ceremony in Parañaque City.
The President also expressed appreciation for his predecessors, acknowledging their efforts in advancing the L1CE project.
“The L-1-CE Project has been a long time in the making—spanning five administrations, starting with President Estrada, to President Arroyo, President Aquino, President Duterte, and now, to mine,” President Marcos said.
“We owe this progress to the hard work and dedication of my predecessors; we must recognize their roles in helping making this dream a reality,” he added.
“By serving commuters across Metro Manila, Cavite, neighboring areas, the whole project creates a smoother, more reliable mode of transport,” President Marcos said.
The project is also expected to accommodate an additional 300,000 daily passengers in the first year of full operations and alleviate traffic conditions in the cities of Parañaque, Las Piñas, and Bacoor, Cavite.
The Chief Executive also affirmed the government’s commitment to a seamless, modernized public transportation system would continue, with additional rail projects like the MRT-7 and the North-South Commuter Railway.

PADRE PIO IN BATANGAS NOW AN INTERNATIONAL SHRINE
SENATE CONCLUDES FIRST REGULAR SESSION OF THE 20TH CONGRESS
GATCHALIAN ELECTED AS ACTING SENATE PRESIDENT
CHIZ ARRIVES AT THE PLENARY, COMPLETES REQUIRED QUORUM OF 12 SENATORS
HOUSE EXPELS CAVITE CONGRESSMAN KIKO BARZAGA
PROPOSED P240 IMMIGRATION FEE FOR TRAVELERS STILL UNDER STUDY – PALACE
116 SUSPECTS, FUGITIVES IN CENTRAL LUZON CAPTURED IN MONTH-LONG CIDG RFU 3 OPERATIONS
ALLEGED SUBSTANDARD APPLIANCES SEIZED IN NUEVA ECIJA BUY-BUST
SM SAN PEDRO JOINS BRIGADA ESKWELA 2026